This was works to a new caravan park on a greenfield site. Fox undertook the topsoil strip, excavated, broke up and crushed obstructions as well as existing hard standings to form useable material for use under the roads and proposed plots. We then profiled the site to form the layout of the caravan park.
In addition we installed service ducts for the hook ups as well as the drainage to the plots. Finally we undertook landscaping works.